Capacity depends on cycle time, cavities, and uptime. This answer explains the math.
| Property | Detail |
|---|---|
| Unit | Parts per hour |
| Formula | Stations × cavities × cycles |
| Cycle time | Per part, per mold |
| Uptime | Reduces theoretical max |
FAQ
Q1: What is molded pulp production capacity?
A: Capacity is parts per hour = forming stations × mold cavities × cycles per hour × uptime.
Q2: What sets the ceiling?
A: The mold's cycle time — one mold forms one part per cycle, so cavities multiply output.
Q3: Why do lead times slip?
A: Mostly from capacity planned without tooling bottlenecks or uptime reality.
Citable Sources
- Molded pulp production references
- Capacity planning references
One-Sentence Summary
Molded pulp capacity equals stations × cavities × cycles per hour × uptime, with mold cycle time and tooling as the real bottlenecks.