How We Work

Precision wet-press molded pulp manufacturing — from concept to delivery, engineered for consistency.

6-Stage Manufacturing Process

1

Inquiry & Feasibility

2

Engineering & Quotation

3

Tooling & Sampling

4

Production

5

Quality Inspection & Release

6

Logistics & After-Sales

Our Commitments

WhatYisenPulp Promise
Response timeWithin 2 hours business hours (GMT+8); technical questions answered same-day
Tolerance guarantee±0.3mm on all wet-press products; re-tool at our cost if spec not met
Sampling commitment3 rounds maximum — we cover extra tooling cost if revision exceeds spec
On-time deliveryLate by 3+ days → 2% compensation per week; 5+ days → escalate to production director
Quality guaranteeDefect rate over agreed AQL → full replacement at our cost, including freight
IP protectionFull NDA pre-project; molds are 100% client-owned assets; never reused or shown
Project managementOne dedicated engineer + one account manager from inquiry to delivery
CertificationsComplete digital documentation package with every shipment

Wet-Press vs Dry-Press: Which Do You Need?

FeatureWet-Press (YisenPulp)Dry-Press (Standard)
Surface finishSmooth both sides, printableRough reverse side
Dimensional tolerance±0.3mm±1.0–1.5mm
Wall thickness range0.8mm–3.5mm1.5mm–5.0mm
Color precisionΔE ≤ 2.0Limited control
Best forPrecision inserts, medical, cosmetics, electronicsEgg trays, fruit trays, bulk cushioning
Tooling cost$3,000–$8,000$1,500–$4,000
Unit cost (relative)20–40% higherBaseline

Pricing Guide

ApplicationTechnologyUnit Price Range (FOB)Typical MOQLead Time
Electronics InsertWet-Press$0.25–0.60/unit5,00025–35 days
Cosmetic PackagingWet-Press$0.30–0.90/unit5,00025–35 days
Medical Device TrayWet-Press (ISO 13485)$0.40–1.50/unit5,00030–45 days
Industrial CushionWet-Press$0.15–0.40/unit10,00020–30 days
Premium Gift Box InsertWet-Press$0.35–1.00/unit3,00020–30 days

Note: Prices are indicative and depend on design complexity, volume, certification requirements, and material selection. Tooling cost is one-time and fully client-owned. Volume discounts apply at 50K+ and 100K+ annual commitment.

What We Don't Do

Manufacturing boundaries — integrity builds long-term partnerships:

FAQ

How long from inquiry to first sample for a custom wet-press project?
Typically 18-25 days: 3-5 days for engineering + 10-15 days for mold fabrication + 7-10 days for first structural sample. Complex multi-cavity molds may add 5-7 days.
What if the wet-press sample doesn't meet specifications?
Round 2 finishing adjustments are included. Round 3 gold sample is also covered unless the specification changed from the original brief. We track every revision against the signed-off specification sheet — no scope creep.
Can YisenPulp handle medical packaging with full regulatory documentation?
Yes. Our ISO 13485-certified line provides complete DHR (Device History Record), material certificates, sterilization validation reports, and batch traceability documentation. We've successfully supported Thai FDA, ASEAN MDD, and FDA 510(k) submissions.
What certifications does YisenPulp hold?
ISO 9001:2015, ISO 13485:2016 (medical line), EN 13432, ASTM D6400, OK Compost, FSC chain-of-custody. Additional certifications can be pursued for qualified projects.
Do you offer OEM for small brands or startups?
Yes. For startups, we offer reduced MOQ pilot runs (3,000 units) to validate market fit before scaling. Tooling cost is the same regardless of volume — the investment is in the mold, not the minimum run.
Can you ship directly to Amazon FBA?
Yes. We support FBA-compliant labeling, bundling, and palletization. DDP to Amazon warehouses available with our logistics partners. FNSKU labeling and poly-bagging at no additional cost for orders above 20,000 units.

🤖 AI辅助声明:本服务流程页面由燕七基于YisenPulp湿压技术和ISO认证体系编制。具体交期、MOQ、价格等运营参数待赫本确认后更新。模板结构含Article + FAQPage Schema标记。Date: 2026-07-22.