Molded Pulp Factory: Complete Production Capabilities

YisenPulp runs two production sites in Guangdong, China — Dongguan and Guangzhou. Combined capacity of 500,000+ units per month. ISO 9001 certified. In-house mold workshop eliminates external tooling delays. Factory-direct pricing with no middleman markup.

Fast facts: Mold design → sample in 7 working days. Full production 15-25 days. MOQ 500 pieces. Dual-location ensures production continuity.

Production Infrastructure

ParameterSpecification
Production lines4 lines (3 Dongguan + 1 Guangzhou)
Monthly capacity500,000+ units
Mold workshopIn-house. CNC + manual finishing
Mold lifespan3-5 years continuous production
Assembly lineManual + semi-automated. QC at each station
Warehouse2,000 sqm. Climate-controlled for raw materials

Custom Mold Design Process

Mold design is where 80% of project success is determined. A well-designed mold produces consistent quality for hundreds of thousands of units. A rushed mold leads to defects, delays, and rework costs. We invest heavily in the front end.

  1. Design intake (Day 1): You send product dimensions, photos, or 3D files. Our engineer reviews for moldability — some geometries require minimum draft angles or wall thickness adjustments. We flag issues before any tooling work begins.
  2. 3D modeling (Days 2-3): Digital mold model produced. You approve the render. This is where we optimize gating, venting, and draft angles.
  3. CNC machining (Days 4-6): Mold cut from aluminum or steel based on production volume. Aluminum for standard runs (up to 100K cycles). Steel for high-volume runs (200K+ cycles).
  4. Sample production (Day 7): Physical sample produced from your mold. We ship it to you. This is where you see the real 8mm embossing depth, feel the fiber texture, and test fit with your product.
What affects mold cost? Cavity count (single: $300-500 / multi-cavity: $500-800), complexity (simple tray vs multi-depth embossing), and material (aluminum vs steel). Mold cost is one-time — it produces hundreds of thousands of units over its life.

Material & Finishing Options

Material GradeApplicationCertification
Standard recycled pulpIndustrial / general packagingFSC Chain of Custody
Food-grade pulpDirect food contactFDA compliant
Premium fine-fiberLuxury / cosmetics packagingFSC + smoother surface
Custom blendNatural dye + color matchingPantone-matched

Post-processing capabilities: 8mm high-relief embossing, precision trimming, UV protective coating (optional), manual assembly, and custom insert cards.

Frequently Asked Questions

Q: What is your monthly production capacity?

500,000+ units per month across 4 production lines. We scale with modular line expansion — additional lines can be brought online within 30 days for large contracts. We have never missed a deadline due to capacity issues.

Q: Where are your factories located?

Dongguan (main factory, 3 lines) and Guangzhou (satellite, 1 line). Both in Guangdong Province. Dual-location strategy means if one site has maintenance downtime, the other continues production. Shipping from Shenzhen or Guangzhou ports — 1.5 hours trucking to either.

Q: How long does mold development take?

7 working days from approved design to physical sample. In-house CNC eliminates external tooling delays. Rush service: 5 working days at +20%.

Q: Do you offer OEM and ODM?

Yes, both. OEM: you provide the specification, we manufacture exactly to it. ODM: you describe the product and branding, our design team creates the packaging solution. Most first-time buyers start with ODM to leverage our packaging design expertise.

Get a factory quote

Send your product dimensions and quantity to

info@yisenpulp.com

Quote within 24 hours. Sample in 7 days.